Calculation of induced voltage in sheath and designing the appropriate cross bonding method.
EHV substation Design and Engineering, development of drawings and related calculations.
Services Offered are - Design of distribution networks, selection of cable size, transformer rating, calculation of voltage drop, calculation of losses in distribution networks.
Site Survey and preparation of Detailed Project Report (DPR) for conversion of existing overhead network to underground with optimisation of transformer sizes and future load forecast.
Preparation of DPR for various transmission and distribution projects including project cost estimation.
Project planning and monitoring.
Preparation of Tender Documents.
Selection of vendor and procurement assistance for major electrical equipments.
Liaison and co ordination with all the external agencies.
Third party factory inspection services for major equipments like Power Transformers, Circuit Breakers etc.